CDM Risk Assessment
The requirements of the new CDM Regulations published in 2015 moved the responsibility for the pre-contract H&S pack from the Main Contractor to the Client or his Principle Designer.works with up-to-date quotations and insights from Apogee's experienced and knowledgeable consultancy team.

What is a Construction (Design and Management) Risk Assessment?
Taking the utility plant search results and comparing them with the client’s scheme drawings, this report delivers a full analysis of risk and a set of recommended actions to minimise on-site Health & Safety risk. It provides a structured approach to identifying hazards, ensuring compliance, and mitigating potential issues. This enables the client to determine what actions are required to ensure HSG47, PAS 128, and CDM regulation compliance while improving overall site safety, efficiency, and reducing potential project delays or costly rework.
This report delivers a Risk Classification, ALARP assessment, severity and likelihood designations, and a comprehensive breakdown of potential hazards. It also outlines best practices for risk mitigation, ensuring adherence to industry standards. The result is a report that takes the client through the process in accordance with HSG47 and PAS 128, enabling competitive tendering for further site investigations, either before or after the pre-contract Health & Safety pack, reducing unforeseen delays, associated costs, and ensuring a smoother project workflow.
Who is the Construction Design and Management (CDM) Risk Assessment suitable for?
Solicitors, Clients, Designers and Project Managers. Developers, Local Authorities Consultants, Architects, Design & Build Contractors, Contractors, Highways scheme promoters, Surveyors and Health & Safety consultants.